Murray Street Footbridge 1989

Designed and documented by Mike Edwards as a graduate working for Cox Etherington Coulter Jones in 1989. The challenge was to link the Myer walkway with David Jones on the opposite side of Murray Street

bridge_13-bw.jpg
bridge_11-bw.jpg